Trinity Baptist Church
Raleigh, North Carolina
Trinity Baptist Church opened the first unit of its permanent church facility in 1962. In 2001 Morrison Engineers provided the structural engineering for a two story building which supplied much needed classroom and office space. The building also boasts a gymnasium with a workout facility and features an elevated track.
Structural Elements:
Structural Steel Beams and Columns
Composite Concrete Slabs on Metal Deck
CMU Shearwalls
Structured Steel Braced Frame
The track is suspended from the roof structure which allows more open space at the gym floor level.



